Gravel & Aggregate Calculator

Work out how much gravel, crushed stone, sub-base or sand to order for a driveway, path, patio base or drain. Enter the area and the finished depth, and get the volume and the weight in tonnes or US tons, with compaction, waste, bags, truck loads and cost.

BS EN 13242BS EN 12620ASTM C29Estimate only — verify with a qualified engineer

Gravel & aggregate

Material

Compaction factor: how much more loose material you need for each unit of finished, compacted depth. Use about 1.15 for sub-base and 1 for decorative gravel. Densities are typical dry values: use your supplier's figure when you have it.

Area 1

Decorative gravel and paths: 40–50 mm (about 2 in). Driveways: 50 mm of gravel on 100–150 mm of sub-base. Enter the finished depth.

Area = 30.00 m²; finished volume = 1.500 m³

1.500 m³ × 1 compaction × 1.05 waste = 1.575 m³ loose

1.575 m³ × 1.60 t/m³ = 2.52 t

Waste, delivery & cost
Gravel
2.52 t

How it's calculated

Area
rectangle L × W · circle π d² / 4 · triangle b × h / 2
Finished volume
V = Σ(area × depth × quantity)
Loose volume to order
V_loose = V × compaction factor × (1 + waste %)
Weight
M = V_loose × loose density
US short tons
tons = tonnes × 1000 / 907.185
Coverage
area per tonne = 1 / (depth × compaction × density)
Bags
bags = M × 1000 / bag mass (or V_loose / bag volume)
Truck loads
⌈ M / payload ⌉

The finished volume is the area times the depth you want after the layer is spread and compacted. Loose material takes more room than the finished layer, so the volume is multiplied by a compaction factor (1 for decorative gravel that is only raked level, about 1.15 for sub-base that is rolled or plated) and by an allowance for waste. Weight is the loose volume times the loose bulk density, which is the density of the material as delivered. A tonne is 1000 kg; a US ton is 2000 lb (907 kg). For a bed of sand or stone under a slab, see theconcrete calculator; for garden walls, thebrick and block calculator.

Worked example: a sub-base path

A path 6 m long and 1 m wide, with 100 mm of finished MOT Type 1 sub-base. Loose density 1.90 t/m³, compaction factor 1.15, 10% waste.

StepWorkingResult
Area6 × 16.00 m²
Finished volume6 × 0.1000.600 m³
With compaction0.600 × 1.150.690 m³
With 10% waste0.690 × 1.100.759 m³
Weight0.759 × 1.901.44 tonnes

For decorative gravel the compaction factor is 1: a driveway 10 m by 3 m at 50 mm deep is 1.5 m³, which at 1.6 t/m³ is 2.4 tonnes before waste. In US units, a patio 20 × 10 ft with 3 in of crushed stone is 50 ft³ (1.85 yd³), or about 2.5 tons.

Assumptions

Frequently asked questions

How much does a tonne of gravel cover?

About 12.5 m² at 50 mm deep, using 1.6 t/m³ (1 / (0.05 × 1.6)). At 25 mm it covers about 25 m²; at 100 mm, about 6 m². In US units, a ton covers about 100 ft² at 2 in deep.

How many bags of gravel do I need?

Work out the weight first, then divide by the bag weight. One tonne is 50 bags of 20 kg or 40 bags of 25 kg. For the sub-base path above, 1.44 tonnes is about 72 bags of 20 kg. Bulk bags are sold by weight or volume, so enter the bag size you will buy in the calculator and it counts the bags for you.

How many tonnes are in a cubic metre of gravel?

About 1.6 for loose gravel and crushed stone. Sub-base such as MOT Type 1 is about 1.9 loose and 2.1 to 2.2 once compacted. Sharp sand is about 1.6 and building sand about 1.5 when dry.

How many tons are in a cubic yard of gravel?

About 1.35 to 1.4 US tons for typical gravel and crushed stone, which is a loose density of 1.6 to 1.65 t/m³. Conversion: tons per yd³ = t/m³ × 0.843.

How deep should gravel be?

Decorative gravel and paths usually take 40 to 50 mm (about 2 in). A driveway is often 50 mm of gravel over 100 to 150 mm of compacted sub-base. Heavier traffic needs a designed sub-base.

How much extra should I allow for compaction?

None for decorative gravel that is only raked. For sub-base that is rolled or plated, 10 to 15% extra is the usual allowance, which is a compaction factor of 1.10 to 1.15.

What is MOT Type 1?

A well-graded crushed stone sub-base mix specified in the UK Specification for Highway Works (clause 803). In the US, crusher run or dense-graded aggregate base (ABC) is used in a similar way.

Standards and references

These documents define the materials and the test methods. The densities used here are typical values, not values from the standards. This calculator estimates quantities only. It does not design a sub-base or check bearing capacity. Have the design checked by a qualified engineer.

Guides